PROJECTS
TENANT IMPROVEMENTS
Tendeg
Description: Managed the design, permitting and construction of a retrofit high-end office buildout for Tendeg, an aerospace R&D firm, which included repurposing multiple dock doors into glass roll up doors, providing additional natural light to the space and access to a custom steel patio and a custom glass movable partition.
TE Connectivity
Description: Completed various office modifications and an expansion for this Class A office buildout, including the installation of an oversized breakroom as well as four restroom banks, complete with showers and locker rooms for employees.
Mulberry Conection
Description: Demised and completed the office buildouts in a first-generation core and shell project known as Mulberry Connection for three national tenants; Winlectric, Gustave Larson and ASCH.
Xero Shoes
Description: Managed the design, permitting and construction process for the build-out of shoe manufacturer Xero Shoes Denver warehouse. The project included 3,188 SF of Class-A office and 81,741 of functional warehouse space.
Epicurean Fine Foods
Description: Modified and demised the first-generation core and shell industrial building to include the buildout of a Class A office pod, installation of dock equipment and installation of a 4,000 SF cooler as part of the overall improvements.
Outpost Construction Supply Co.
Description: Demised and improved the first-generation core and shell to include a Class A office block. Sprink provided a seamless, client-centered experience across various stages of real estate services, development and construction.
Head Rush Technologies
Description: Managed the design, permitting and construction for the improvements of the core and shell to a Class A, 3,300 SF office and functional warehouse space for adventure product supplier Head Rush Technologies.
SPECIALIZED PROJECTS
Capital Improvements
Description: Remodeled interior office and transformed the building’s exterior with a new paint job, installed new drive-in doors, rebuilt the parking lot as well as constructed an ADA compliant ramp with a new handrail.
Fire Riser Room
Description: Upgraded existing fire sprinkler system to ESFR, including the installation of a 1000 GPM, inline fire pump to meet NFPA and local code for the new tenant’s plastic storage use.
Oxygen Room
Description: Managed the design and construction process of the highly specialized, code-required oxygen room for national home respiratory supplier Rotech.
Ramp Installation
Description: Replaced dock-high loading with the installation of a concrete drive-in ramp.